Family-owned  ·  South East Queensland  ·  8 LGAs

Solar design,
supply & install
for builders.

Plan-based packages, roof-stage installs, STCs, and warranty exit. We work behind the builder — never alongside the homeowner.

Coverage

8 LGAs

SE QLD + Toowoomba

Slot confirm

24 hrs

From submission to install slot

Install

1 visit

Roof-on through commissioning

NatHERS

+1.0

Typical uplift, 6.6 kW

Panel warranty

25 yr

Tier-1 Jinko Tiger NEO

§ Coverage

One trade. Eight growth corridors.

We run install crews across South East Queensland and the Toowoomba region — sequenced to your roof-on calendar, not a national rollout schedule.

FIG. 01 / SE QLD COVERAGE Not to scale · Service-area diagram N Brisbane 01 · -27.47° Gold Coast 02 Sunshine Coast 03 Logan 04 Ipswich 05 Redland 06 Moreton Bay 07 Toowoomba 08 ~ 100 KM CLIMATE ZONES 2 + 5 ENERGEX · ERGON

§ Process

A solar trade your team can schedule.

We work behind the builder. Plan-based design, supply, roof-stage install, final-fit commissioning, STC paperwork, warranty path. Three acts, no surprises.

Act 01

Procure

Tell us your plan status on the request form. If you have a set, email it to orders@tradesolar.com.au and we will come back with a quote-ready package within one business day. Your selections team includes it like any other inclusion.

Output Spec sheet · RRP · Margin
Act 02

Schedule

One install slot per home, locked to your roof-on date. Crew arrives, fits, commissions, lodges grid connection — single visit. SMS to site super 48 and 24 hours ahead.

Window Roof-on → Commission
Act 03

Exit

STC claim, electrical safety cert, grid energisation, warranty registration — bound into a single compliance pack. From handover, the homeowner calls us, not you.

Result Zero post-handover calls

§ Package ladder

Three tiers your
team can quote.

Builder-ready starting points. Add batteries, EV charging, or backup when a plan calls for more.

Starter

]

3.3 kW

  • Panels7 × 475 W
  • InverterSungrow 3 kW
  • Battery
  • Whole-of-HomeHelps the energy budget

Entry-spec inclusion for energy-rating goals.

★ Standard

Builder default

]

6.6 kW

  • Panels14 × 475 W
  • InverterSungrow 5 kW
  • BatteryOptional 9.6 kWh
  • Whole-of-HomeStronger WoH contribution

Strongest fit for 7-star QLD project homes.

Step-up

]

10 kW

  • Panels21 × 475 W
  • InverterSungrow 8 kW hybrid
  • Battery9.6 kWh + EV
  • Whole-of-HomeLargest WoH contribution

All-electric homes, EV charging, 8-star spec.

Every package can be designed from your plan set and delivered as a builder-only design, supply, and install service.

§ Accreditation & trust

SAA

Solar Accreditation Australia

Current solar designer and installer accreditation scheme for SRES eligibility.

STC

SRES / STC paperwork

Small-scale Technology Certificate support for eligible new-home systems.

QLD

Electrical licensing

Electrical works by 3Phase Electrical Pty Ltd, QBCC licence 1513900.

We are a family-owned and operated SEQ trade, with crews across Brisbane, Gold Coast, Sunshine Coast, Logan, Ipswich, Redland, Moreton Bay, and Toowoomba.

§ Begin

Request a solar design.
We do the rest.

One package, three options, ready to drop into your selections sheet. No retail homeowner quoting. No margin leak. Single point of contact.

Reply We reply within one business day